Pages

Saturday, May 29, 2010

National Technology Incorporated


The S1- UNDERWATER WELL CAP ASSEMBLY
Vibert Greene
5/29/2010





 
The S1- UNDERWATER WELL CAP ASSEMBLY
A SOLUTION TO PERMANENTLY CAP ANY UNDERWATER PIPE- LINE LEAK(S) INCLUDING OIL LEAKS.
Vibert Greene
5/29/2010

Respondent: vbigmac@aol.com; 510-794-5862vbigmac@aol.com
respondent Name: Vibert Fitzpatrick Greene
Address: 6262 Jarvis Avenue
Newark, CA 94560
Cell phone: 510-648-4244
Home phone: 510-794-5862 

 
WHO IS TO BLAME FOR THE LONG DELAY IN PERMANENTLY CAPPING THE GULF OF MEXICO OIL LEAK(S)? I SAY BP, CNN-iREPORT.COM and the OBAMA ADMINISTRATION MUST SHARE THE BLAME FOR THE DELAY IN CAPPING THIS ECOLOGICAL DISASTER—IN MY OPINION, WHY? SEE BELOW:


I have sent; fax and e-mail this permanent oil leak cap design to BP, the iReport (CNN), the President and his administration—guess what? No response. This is irresponsible on the Obama administration, the news media and BP. I also told them that the dome and the "Top Kill" will not work and I was proven right. Ask these officials why they continue to ignore this simple, easy to assembly e oil and gas flow permanently, once that's done the relief valve will be closed. That will fix the problem. This is not the "Junk Shot". The difference is; after the Cement & gravel containers are ripped open and the relief valve plug closed, the cement power and gravel/rocks/pebbles will mix rapidly by the turbulence from the out flow of oil and gas; then this mix will start to harden as it falls to the bottom cylindrical assembly thus closing off the leak(s). Please find the design solution below. It can be put together in 2-days. Compensation can be dealt with later –Could this be the reason for the No Response?
Requirements and Technical Information
for
Capping the oil leak in the Gulf of Mexico


S1 OIL CAP ASSEMBLY COMPONENTS

Materials Required.
1. Containers filled with Quick-set cement and pebbles
2. Zip charges
3. Sliding Gate type valve
4. Squib charge
5. Retainer rings for restraining the Containers filled with Quick-set cement and pebbles in place
6. Fire suppression packing

Equipment Required:
1. Welding equipment
2. Cables
3. Electric wires for squib and zip charge
4. Electric signal control box
Expertise Required:
1. Welding
2. Explosive technicians/experts
Technical Description
for the S1 OIL CAP ASSEMBLY
:
(The Permanent Under Water Oil Leak Cap technology: Designed by Vibert Greene--)

The S1 Oil Leak Cap Assembly consists of:
(1) A cylindrical vessel that housed several containers filled with quick-set cement and pebbles/rocks these are held in place by circular supports and fire suppressant packing. Note, each layer is separated from the other by circular supports and fire suppressant packing. The cement containers are lined with zip-charges that will rip the containers on command to release their contents (cement power and pebbles). The turbulences from the release gas and oil will mix the cement and pebbles to form a permanent seal.

(2) On the side of the content-filled cylindrical vessel--(1) and close to the larger cylindrical cap--is a relief pipe and shut-off valve; with a sliding plug to shut off the relief pipe on command.

(3) On top of the slide plug is a heavy cylindrical cap that is attached to the larger cylindrical cap by a breakable rod and a squib charge assembly to separate the slide plug cap from the larger cylindrical cap when the squib charge is triggered; the sheer weight of the heavy cylindrical slide plug cap will push the slide plug in place to seal off the relief pipe.

(4) A larger heavy (cylindrical) cap and handle is secured on top of the content filled cylindrical vessel that housed several containers filled with quick-set cement and pebbles/rocks.

(5) 4 legs are attached to bottom of the Oil Leak Cap Assembly anchor it over the leaking pipe.

Note: The assembly size is dependent upon the size of the pipe and size of leak; multiple leaks in close proximity may require only one appropriately sized container.
This design will permanently cap the oil leak--it is simple—easy to assembly, safe and effective.


IF THE POWER POINT FORMAT OF THE DESIGN CANNOT BE VIEWED, INTERESTED PARTIES CAN E-MAIL ME FOR A COPY OF "the permanent underwater oil leak cap design."


the permanent underwater oil leak cap design.
It is cost effective, simple—easy to assembly, safe and effective
Designer: Vibert Greene.
Email:
3-Multi-Applications


The cement containers lined with zip-charges are ripped on command and their contents (cement power and pebbles) released. The turbulences from the escaping gas and oil mixes the cement and pebbles to form a permanent concrete seal.

No comments: